Residential Solar

Klerksdorp Residence - 8kW Solar System

Klerksdorp, North WestDecember 20258kW System
Project Result65% electricity savings

Project Overview

Complete off-grid capable solar installation for a family home in Klerksdorp. The system was designed to handle the household's peak loads while providing backup power during load shedding.

The Challenge

The client needed a system that could power essential loads during extended load shedding periods while maximizing daytime solar usage to reduce their R4,500 monthly electricity bill.

Our Solution

We installed a Sunsynk 8kW hybrid inverter paired with 16 high-efficiency 500W panels and a 10.24kWh lithium battery bank. The system was configured for time-of-use optimization, charging batteries during off-peak hours when solar isn't available.

Results Achieved

  • Monthly electricity bill reduced from R4,500 to R1,575 (65% savings)
  • Zero disruption during load shedding up to Stage 6
  • Excess power exported to grid for credits
  • ROI expected within 4 years
"DUE Engineering transformed our home. We barely notice load shedding anymore, and our electricity bills have dropped dramatically."
The Mokoena FamilyKlerksdorp